PRODUCTS
- Aerial Bundled Cables
- Airport Cables
- Automotive Cables
- Alarm & Audio & Electronic Cables
- Belden Equivalent Cables
- Bus Cables
- Cable Glands
- Cables for Oil Industry
- Coaxial Cables
- Composite Cables
- Control Cables
- Data Cables
- Elevator Cables
- Fiber Optic Cables
- Fire Resisting Cable(Fireflix)
- Fire Retardant Cable(FIRETOX)
- Flame Retardant Cable (FIREGUARD)
- Flexible Cables
- Heat Detection Cables
- High Temperature Cables
- Highway Cables
- Industrial Cables
- Instrumentation Cables
- Marine Cable
- NEK606 Water Blocked Offshore & Marine Cables
- IEC60092 STANDARD Offshore & Marine Cables
- BS 6883&BS7917 STANDARD Offshore & Marine Cables
- UKOOA Offshore & Marine cables
- VG 95218 Navy Cables
- Mining Cables
- Airframe Wire
- Marine, OIL,GAS & Petrochemical Cables
- Power Cables
- Railway Cables
- Robotics
- Rolling Stock Cables
- Rubber & Crane Cables
- Security Cables
- Special Cables
- Spiral Cables
- Telephone Cables
- Thermocouple Cables
- BS 5308 Cable
- PAS 5308 Cable
- BS 5467 Cable
- BS 6724 Cable
- BS 6346 Cable
- BS 7211 Cable
- IEC 60502-1 Cable
HOT PRODUCTS
APPLICATIONS
|
Ethiopia-Kenya Converter Station Project
Sodo–Moyale–Suswa High Voltage Power Line (or Ethiopia–Kenya HVDC Interconnector) is a 500 kV bipolar high-voltage direct current electricity power transmission line, under construction, connecting the Wolayta converter station (6°54′27″N 37°43′19″E) near Sodo, Ethiopia with the Suswa converter station (1°3′44″S 36°21′35″E) near Suswa, Kenya.
This power line serves one major purpose. It will enable Ethiopia to transfer surplus electricity to Kenya, for sale to the countries of the East African Community and the Great Lakes Region. The power generated in Ethiopia is less expensive than that generated in Kenya, and the new energy purchases are expected to lower the general power tariffs in Kenya and promote industrial growth in the country.
The entire power line in both countries is budgeted at KSh126 billion (approximately US$1.26 billion). Funding was sourced from the World Bank and the African Development Bank, the principal financier. Completion is expected in June 2019. In August 2018, The EastAfrican reported that at that time, 75 percent of the work in Kenya was complete, while simultaneously, 90 percent of the work in Ethiopia was complete, with commissioning expected in 2019.
Caledonian had supported this project with CCECC ETHIOPIA CONSTRUCTION P.L.C, for three systems, Grounding materials, Electrode cables, Electrical auxiliaries, and provided copper tapes, welding materials, section feeder and well feeder cables, rod cables for FeSiCr ground electrode, power cables, data cables and fiber optic cables.